Not known Factual Statements About Concrete pile foundation environmental impact
Then, fill the hopper with concrete to its full capacity. At the time loaded, remove the metal plug to allow the concrete to flow down, and replace the bentonite slurry current while in the pipe.ten. Last but not least, end the monotonous system upon achieving the designated unexciting depth. Look at the borehole depth by measuring bailer pipe leng